Fatjon Bardho · architect · ofWhite Architects · 2026
Buying off-plan on the Albanian coast: what an architect checks before you pay
The short answer: your lawyer checks who owns it and whether it may be built. Nobody checks what you are actually buying. Before the deposit, the plan, the net area, the orientation and the specification should be read by an architect. On the Albanian coast the sea view usually faces west, salt eats cheap metal, and an apartment closed for eight months needs different details from a home that is lived in.
The lawyer checks the paper. The architect checks the apartment.
They are two different checks and neither replaces the other:
For the contract side we have a separate list of 35 points: the BLEJ checklist.
| Ownership | Who owns the plot and whether there is a charge on it | Whether the plan you are sold matches the one approved in the permit |
|---|---|---|
| The permit | Whether the building permit is valid | How many net square metres you really get, room by room |
| The contract | The dates, the penalties, the payment terms | Orientation, sun, the view and what may be built in front |
| Registration | The transfer of ownership and the cadastre registration | Which windows, insulation and finishes are written into the contract |
| Handover | That the documents are in order | That the apartment is the one you paid for: measured, water-tested, free of defects |
Eight documents to ask the developer for
A serious developer has them ready. Tick the ones you have received:
Start with the dimensioned plan and the technical specification.
The sea is to the west: sun, salt and season
Choose which way the living room and balcony face:
The arc shows the sun's path from east, through south, to west. The wavy lines are the sea. In some bays the sea lies to the south or south-west: ask for the north arrow on the plan.
- SaltNear the sea, ask what the railings, the window hardware and the air-conditioning brackets are made of. Grade 316 stainless steel or galvanised, powder-coated steel hold up; ordinary steel rusts within a few seasons.
- Closed for monthsAn apartment shut from October to May needs ventilation that works on its own: trickle vents in the windows or a timed extractor in the bathroom. Otherwise the smell of mould greets you in spring.
- The view that staysThe empty plot in front is somebody's future building. Ask what the plan allows on it and request the site plan.
- The seasonThe noise from the bars, the parking and the water pressure all change in August. See the place once in August and once in January before deciding.
- If you plan to let itOne bathroom for every two bedrooms, a lockable cupboard for your own things, a place for a washing machine and finishes that survive suitcases.
How the purchase runs
In broad terms, an off-plan purchase goes through five steps:
The architect's check comes before the second step, because after the preliminary contract every change is a negotiation. The down payment on new builds is typically about 30%. This is a general outline: your lawyer runs the legal steps.
What can be checked at each stage
The earlier, the cheaper it is to fix. Choose where the building stands today:
Handover day: ten tests
Bring a laser measure, a bucket and your phone charger:
- Measure every roomWith a laser measure. Compare the net area with the one in the contract.
- Pour water on the balcony and in the showerThe water has to run to the drain on its own, not towards the door.
- Open and close every window and doorThey should close without force. Look at the seals and whether light shows beside the frame.
- Test every socket and switchWith your phone charger. Ask for the breakers in the panel to be labelled.
- Run all the taps at onceThe pressure, the hot water and the toilet flush are tested together.
- Look at the ceilings and cornersStains and blistered paint mean water from the floor above or from the facade.
- Tap the tilesA hollow sound means the tile has not bonded. Check the level at the thresholds too.
- The air-conditioning pre-installationThe pipes, the condensate drain and the power should be at every promised point.
- The common partsThe lift works, the stairs are lit, your parking space is marked, the facade is finished.
- The list of defects, signed and datedEverything that is wrong is written down, signed by the developer and given a deadline. The keys come after it.
Frequent questions
Can a foreigner buy an apartment in Albania?
Yes, foreigners can buy apartments and houses without restriction. Agricultural land follows different rules. For any specific case, ask an independent lawyer.
Do I have to be in Albania for the check?
No. The plan, the specification and the site plan are reviewed remotely. The site visits are made on your behalf, with photos and video, and you receive a written report.
Is the sea-view side always better?
It has the best view and the hottest afternoons, because on most of the coast the sea lies to the west. It is worth it when the balcony is deep and there is external shading.
When do I become the owner?
In off-plan purchases the final contract is signed once the building is finished and certified for use; the property is then registered in the cadastre. Until then you hold a preliminary contract. Your lawyer follows these steps.
What does an architect's pre-purchase check include?
A reading of the plan and the net area, the orientation and sun, the technical specification, the site plan and, once construction has started, a visit to the site.
Do not do the handover alone and do not do it in the evening. Defects show in daylight, and whatever is not written down that day becomes your problem the next.
ofWhite Architects
Architecture and interior design studio in Tirana since 2010.
Interactive version on the site →Contact usWhatsApp