Off-plan or ready-built: which is worth it?
The short answer: off-plan you pay about 9% less and in instalments, but you wait and you carry the handover risk. A ready-built apartment costs more, but you see what you are buying and can move in tomorrow. Which is worth it depends on one thing: what the wait costs you.
The difference at a glance
| Price | Lower. You pay less because you wait and carry the risk. | Higher, but final: no surprises before handover. |
|---|---|---|
| Payment | In instalments, following the construction stages. | In full at the sale deed, from savings or a loan. |
| What you see | A floor plan, a render and a building site. | The apartment itself: the light, the noise, the ceiling, the neighbours. |
| Changes | Partitions and services can be changed before they are built. | Every change means demolition and renovation. |
| The risk | Delay, lower quality than promised, changes from the design. | Hidden defects, though an inspection can find them. |
| Paperwork | A contract with the developer. Ownership is registered after completion. | The ownership certificate exists and is checked before you buy. |
What the wait costs you
The off-plan discount only makes sense if it is bigger than what you spend while waiting. Enter your own figures:
The calculation leaves out price rises or falls during the wait, and loan interest.
When off-plan makes sense
- You have somewhere to live rent-freeThen the wait costs you nothing and the whole discount stays with you.
- You want to adapt the layoutBefore construction, moving a wall or a bathroom is a drawing, not a demolition.
- The developer has buildings delivered on timeA track record is the best guarantee you have.
- Staged payment helps youYou spread the sum while the building goes up.
- You want to choose the floor and orientationAt the start of sales there is still choice. At the end, what nobody wanted is left.
When ready-built makes sense
- You pay rent todayEvery month of waiting eats part of the discount. Work it out above.
- You want to see what you buyLight at different hours, street noise and ceiling height do not show in a render.
- You do not want your life to hang on a deadlineThe children's school and your job do not wait for handover.
- You want to rent it out straight awayIncome starts in the first month, not two years later.
Five off-plan risks and how to close them
None of these is solved with words. Each one is closed with a document:
- DelayA handover date and a late penalty in the contract. Without a penalty, the date is only a promise.
- The apartment differs from the planThe floor plan from the permit drawings annexed to the contract, not the marketing brochure.
- Lower quality than promisedA signed technical specification: windows, floors, doors, sanitaryware. Visit one of their finished buildings.
- You pay faster than it is builtTie the instalments to construction stages, not to calendar dates.
- Problems with the permit or the landA valid permit on e-Leje and an ASHK certificate that the land carries no lien.
How to check a ready-built apartment
The advantage of a ready apartment is that you can inspect it. Use it:
- Go at two different timesOnce in the morning and once in the afternoon, for the light and the noise.
- Look for dampCeiling corners, behind furniture, below the windows and in the bathroom.
- Test the servicesWater pressure, drains, the electrical panel and the heating.
- Measure it yourselfThe net area and the ceiling height, not the ones in the listing.
- Check the papersThe ownership certificate, the ASHK record and any debts to the building management.
Frequent questions
Is it cheaper to buy off-plan?
Usually yes. In Tirana listings in 2026, the median price of apartments under construction was about 9% lower than that of finished ones. The gap is your payment for the wait and the risk.
How much is the down payment?
It depends on the developer. Many offer instalment plans with a down payment of about 30%.
Can I negotiate the price?
Yes. The asking price is usually a few percent above the final one, for off-plan and finished apartments alike.
Keep one instalment for handover day. It is the only leverage you have over the final defects.