Renovating an old house: what to check before you demolish
The short answer: before you demolish, check four things. The structure: cracks, damp and the floors. The services: wiring and plumbing are usually replaced entirely. The documents: does the house match its permit and the cadastre. And what you are allowed to change. Load-bearing walls are not opened without an engineer, and changes to the facade, balconies or extensions need a permit.
The check before buying or demolishing
- CracksDiagonal cracks from window corners, or cracks that widen, point to foundation movement. Hairline cracks in the plaster usually do not.
- Floors and roofRotten timber at the bearings, rusted steel in the concrete, a leaking roof. These decide whether the renovation is worth it.
- DampOn the ground floor and in walls against the ground. It is solved before any finish.
- The paperworkThe title deed, the registered floor plan and the permit. Any difference from them must be resolved before the works.
What stays, what goes
| Element | Usually | Note |
|---|---|---|
| Load-bearing walls | stay | new openings only with a structural design |
| Timber floors | strengthened or replaced | check the bearings |
| Wiring | replaced | new earthing and board |
| Plumbing | replaced | old iron pipes corrode |
| Windows | replaced | with thermal and acoustic insulation |
| Roof | repaired or rebuilt | with insulation and waterproofing |
The order of works
- Design and permitsAn accurate survey, a design and, where needed, a renovation permit. Maintenance works are usually carried out with a prior declaration to the municipality.
- Demolition and structureControlled demolition, then the strengthening. No finishes until the structure is safe.
- Roof, windows, dampThe house is made weathertight before the services go in.
- Services, plaster, floorsPipes and cables before plaster; screed after them; finishes last.
Read next
- What an apartment renovation costs→
- Building and renovation permits→
- Damp and mould: causes and fixes→
Frequent questions
Can I remove a wall inside the house?
Only if it is not load-bearing, or with a structural design that replaces it with a beam or frame. In stone or brick houses, most walls are load-bearing.
Does a renovation need a permit?
Changes to the facade, balconies, entrances and small extensions need a renovation permit. Interior works that do not touch the structure are usually done with a prior declaration. Check with the municipality.
Renovate or demolish and rebuild?
It depends on the structure and the permit. If the walls and foundations are sound, renovation usually costs less and keeps the character. If the structure is damaged, a new build may be safer.
How long does it take?
For a 120–200 m² house, 6–12 months of works after the design and permits, depending on the state of the structure.
Have the survey and the structural check done before you buy. Their cost is small next to a floor that has to be rebuilt.
General guidance. Permit procedures vary by municipality and type of work.